Activated Carbon Mimic Panel

Hi folks,

Yesterday was a bit of a cliffhanger for us at the WTP

We weren't sure how we were going to load Activated Carbon, with the conveyor motor stuffed

Well, in the end, we got a 100 tonne crane in

Removed the hatch from the top of the 50 tonne silo, harnessed up for a full day of working at heights, and climbed on up

Each 500kg bag was lifted to the top of the silo and moved into position over the open hatch

I had the job of opening up the underside of each bag and getting the extremely fine powder to flow out through the bottom

It was hard, dirty work

The powder refused to flow any quicker than an hourglass egg timer under it's own weight

The first few took a lot of coaxing

It's like talcum powder, but dark black

Like the Activated Carbon you might have inside an aquarium filter, but much finer

We tried a bunch of different techniques

Mostly involving brute strength and ignorance, as a co-worker likes to say

Kicking, punching and forceably poking the bag with a solid piece of timber to try and loosen up the substance

It didn't help that the bags were stacked two-high to a pallet, and every bottom bag would be compressed beyond all reason

Around the fourth bag, the rigger had the awesome idea of cutting a hole in the side and poking a long-handled shovel through to the bottom, working it around as it went down

Then, when it was flowing, digging the stubborn powder from the edges into the middle, until the bag was empty

We got seven bags emptied before lunch

That's 3.5 tonnes

And in the afternoon, another 15 (7.5 tonnes)

For a total of 11 for the day

While we were doing this, getting covered head-to-toe in black powder and worn out from all the shoveling, my co-workers were busy sourcing a replacement motor

Turns out we didn't have a spare

Why oh why didn't we have a spare?!

(Oh yeah, the constant downward cost pressure from two decades of privatisation of the metropolitan water supply, constant reductions in staffing and budgets, and the top-down imposition of just-in-time inventory management systems upon critical infrastructure built originally by a rationally-resourced municipal government department and since overtaken by privately-owned multinational corporations has made it that keeping a well-stocked inventory of spare parts is considered wasteful spending.)

This is CRITICAL INFRASTRUCTURE. The Water Supply, for millions.

...

A country's water supply is more important than private profiteering

...

So by day's end, we had confirmation that a new motor for the loading system was sourced and would most likely be here by tomorrow

So, we just have to wait and see...

There's enough in the silo now to last a couple of days, and I'm thoroughly exhausted