Nice to greet you dear readers, as I told you in a previous post, I am making some arrangements in my apartment with my first Power downstairs, the same is to finish an extension that I am doing in what will be the laundry room and part of the kitchen.
As it is a new area I am starting from scratch, I already have the floor finished and I have not polished it yet, but there are still many details to put that area one hundred percent operational, I am working with everything improvised and I confess that generates me a lot of stress.
I recently bought my washer and dryer, which has a structure that allows me to mount the dryer on top of the washer and helps me save a lot of space.
Right next to it will be the laundry room and then the continuity of the kitchen.
But There are many things that need to be done and although they seem minimal they take time and work, besides I only have the weekend to work on it.
In this opportunity we put the electricity to that area, with a continuation of wiring that is not of the same diameter, which will have to wait how it works, if not I will have to replace it, but as the mason suggested it and he is the one who knows, I will have to wait.
So we had to break the wall to put the electricity pipe with a bend also of electricity to fix two sockets. One for the stove and fridge and the other for the washer and dryer.
But it is not only to put the pipe, but then cover it with cement to make it as smooth as possible so as not to have an excessive expenditure in stucco, I took the opportunity to correct a leak that had at one end of the roof and will have to wait for rain to see if it was right.
But imagine the stress of working with everything in the way and full of cement because the space was small and there was no electricity.
I still haven't put a light bulb in that area because it has not yet been defined where the current will be taken from and I still need to buy more electricity pipe because I already used the one I had.
I took the opportunity to fill some holes I had in the wall and because of the time we could not do more, since the mason arrived late and did what he could with what we had at hand.
The next step will be to wait how the wiring works, if not we will have to replace it completely and finish the electricity in that space, as for the dryer and two light bulbs that I want to put in that area, one inside the laundry room and one outside the apartment near there.
This has been my weekend adventure, I have been in a construction, I hope for the other weekend to have the necessary money to finish the electrical work and get fully involved with what is to pass to that annex the white water and drainage for the washing machine and the sink.
I'll tell you in a future post how I'm doing, since I only have the weekend to do these activities because during the week I'm working.
I'm @yelimarin and I'll see you soon, happy start of the week.
The images are my own, taken with my Redmi 9A cell phone, I used the translator DeepL, since I do not master the English language and the InShop application for the cover photo.