7y
Recent Oman IPP Project Summary and Ibri & Sohar site IPP Project Projection
PDF DOWNLOAD: 2,600 MW IPP project is under development at Ibri and Sohar in Oman by OPWP. ENGIE, Mitsui and Marubeni are competing for the project. Recent Oman IPP proejcts are analyzed in this blog since
$ 0.000
1
2
anagnorisis
project
7y
Sembcorp Salalah IWPP Project Finance Modeling & Case Study Summary
PDF DOWNLOAD: PDF DOWNLOAD: XLS DOWNLOAD: Location : Between the towns of Taqah and Mirbat, approximately 50 km from the regional town of Salalah. Type : Gas-fired combined cycle power generation plant
$ 0.000
1
anagnorisis
project
7y
Oman Barka-3 IPP Project Finance Modeling & Case Study Summary
PDF DOWNLOAD: PDF DOWNLOAD: XLS DOWNLOAD: Location : Approximately 80km northwest of Muscat in Oman, in the immediate vicinity of the existing Barka-1 and Barka-2 IWPPs Type : Gas-fired combined cycle
$ 0.000
2
anagnorisis
project
7y
Oman Sohar-2 IPP Project Finance Modeling & Case Study Summary
PDF DOWNLOAD: PDF DOWNLOAD: XLS DOWNLOAD: Location : Approximately 200km northwest of Muscat in Oman, within the Sohar industrial Port area Type : Gas-fired combined cycle power generation plant Capacity
$ 0.000
1
anagnorisis
project
7y
Oman Sur IPP Project Finance Modeling & Case Study Summary
PDF DOWNLOAD: PDF DOWNLOAD: XLS DOWNLOAD: Location : Approximately 175km south-east of Muscat in Oman Type : Gas-fired combined cycle power generation plant Capacity : Contracted power capacity of 2,000
$ 0.000
1
anagnorisis
project
7y
Reliances RPL Project Finance Case Study Summary
PDF DOWNLOAD: Source : RIL ■India based largest private sector company ■Market cap : US$36bn ■Revenue : 2.8% of the GDP ■Contribution to total export : 8.2% ■Contribution to Gov't tax revenues : 8% ■Weighting
$ 0.000
1
anagnorisis
project
7y
Peru LNG Project Finance Case Study Summary
PDF DOWNLOAD: Source: Location: Along the Pacific ocean and 600km from the Amazon jungle 600km - 200km existing, 408km, 34 inch to built Construction due date: by 2010 Plant: 52ha at Pampa Mechorita, 167km
$ 0.000
2
anagnorisis
project
7y
Moroccan Safi IPP Project Finance Case Study Summary
PDF DOWNLOAD: Location: Greenfield coastal location outside the port of Safi (200km south of Casablanca) Capacity : 1,380MW (gross) Type : Coal-fired power plant Major equipment : Boilers from IHI and
$ 0.000
1
anagnorisis
project
7y
Kirikkale IPP Project Finance Case Study Summary
PDF DOWNLOAD: Location : Near the city of Kirikkale, 50km east of Ankara Combined-cycle power plant comprising two Alstom gas turbines and one steam turbine Gross output capacity of up to 950MW Financial