This post is from a low-reputation account and contains an unverified outbound link. Be cautious before clicking external links.

Peru LNG Project Finance Case Study Summary

Words
106
Reading
1 min
9y
Listen to this post
~1 min

PDF DOWNLOAD: https://drive.google.com/file/d/0B8q3CwnJVwZsalJWOF9JdjRMWGc/view

Source: http://www.hydrocarbons-technology.com/projects/peru-lng/peru-lng2.html

  1. Location: Along the Pacific ocean and 600km from the Amazon jungle
  2. 600km - 200km existing, 408km, 34 inch to built
  3. Construction due date: by 2010
  4. Plant: 52ha at Pampa Mechorita, 167km south of Lima,
    ■ Near Pan American highway
    ■ Beneficial for shipment & NIMBY
    ■ Near Camisea gas field -> Easy access for natural gas supply
  5. Practicalities
    ■ Panama canal expansion -> Easier access to Europe
    ■ Cut Mexican demand -> Lower prices for US consumers
  6. Possibility to expansion of another train.
    ■ Repsol discovered more gas in Block 57.
    ■ Petrobras is drilling in Block 110.

Source: http://www.pfie.com/unshakable-peru-lng/21073480.fullarticle

Peru LNG Project Finance Case Study Summary | Ecency