20210903 Bungalow construction (slab formwork) - day 59

Words
231
Reading
2 min
Listen
Play
5y

The formwork for the concrete slab on top of the workshop is up.
IMG_8279.jpg
IMG_8281.jpg
IMG_8285w.jpg
IMG_8297.jpg
IMG_8298.jpg

IMG_8299.jpg

IMG_8300.jpg

Today's crew is tying down metal rebar for the beams that will support the slab
IMG_8280.jpg
IMG_8282.jpg
IMG_8284.jpg

The whole rebar system is hand made. The last step of the assembly involves tying up rebars together with small metal wires.
IMG_8302.jpg
IMG_8301.jpg

This is the pentagon of the living room. It looks asymmetrical because of the perspective but it is a regular pentagon.
IMG_8283.jpg

Details of rebar connections and wood formwork of the future beams and slab,
IMG_8286w.jpg
IMG_8287.jpg
IMG_8288.jpg

Plan view of both pentagonal structures is now visible.
IMG_8289.jpg
IMG_8307.jpg

Electrical conduit is in place. They will be sealed inside the concrete.
IMG_8290.jpg

They converge to an electrical panel, one per room.
IMG_8292.jpg
IMG_8293.jpg

First coat of paint for the metal structures.
IMG_8294.jpg
IMG_8295.jpg

The frangipani tree that was next to the existing land temple was cut into many pieces. They are tied to a tree to create new rooting systems. This is the traditional way of creating new frangipani trees. Some of those new trees will be included in the new pentagonal temple. The frangipani flower is used extensively for Balinese ceremonies.
IMG_8296.jpg

Second color test for the visible metal members of the structures. We're going with sand color on the right but we need to find another brand of paint because this one is too shiny. We want a flat finish.
IMG_8305.jpg

Explaining the build concept of the Mantap sculpture to the crew.
IMG_8308.jpg