Discover
Communities
Decks
Login
Discover
Communities
Decks
Buy perks
Login
Signup
Pentarchitecture
Pentagon-based architecture
Leadership
@igb
admin
Trending
Hot
New
Payouts
Muted
Members
Activities
11
Members
$ 0
rewards
0
posters
EN
language
Join
New Post
igb
igb
Pentarchitecture
2y
20211207 Bungalow construction (door lock reference) - day 154
References and ideas for the door lock mechanism that Arie and his crew are working on
$ 0.00
0
igb
igb
Pentarchitecture
2y
20211203 Bungalow construction (bedroom shutters) - day 150
Each of the 8 bedroom windows gets a wooden shutter. Shutters are installed inside. Custom metal hinges made by Arie and crew connect wood board to metal frame.
$ 0.00
1
igb
igb
Pentarchitecture
2y
20211201 Bungalow construction (workshop steps) - day 148
Fabrication of the steps to access to workshop Sanggah temple intersecting steps bring tight interaction between the two structures.
$ 0.00
1
igb
igb
Pentarchitecture
2y
20211129 Bungalow construction (water well digging complete) - day 146
The boring of the well which started 40 days ago is finally complete. Water tested at a depth of 60 meters was plentiful and high quality.
$ 0.00
0
igb
igb
Pentarchitecture
2y
20211128 Bungalow construction (ceiling fixtures) - day 145
Ceiling fans and spotlights Main space Bedroom Bedroom electrical panel
$ 0.00
0
igb
igb
Pentarchitecture
2y
20211126 Bungalow construction (Trimdek walls) - day 143
Inside the main space East swing wall. This entire wall swings open to offer an unobstructed view of the rice fields. West swing wall. This entire wall swings open onto the floating terrace and more rice
$ 0.06
2
igb
igb
Pentarchitecture
2y
20211124 Bungalow construction (Sanggah temple complete) - day 141
The Sanggah temple is complete. It is made of concrete, bricks and plastered with cement mixed with black sand from the nearby beach following the local tradition.
$ 0.00
0
igb
igb
Pentarchitecture
2y
20211123 Bungalow construction (outdoor light fixtures) - day 140
Installation and test of 20 exterior light fixtures on two bungalows.
$ 0.16
7
Ecency