Lately, our home build seems to be moving in slow motion. A few leads for a drywall contractor have fallen through which, in a way, is good because my timeline for drywall keeps getting pushed back. Things that were overlooked still need to be finished, and the tub surround fiasco continues. At the time I filmed this, I estimate I have lost a full 3 days of productive work due to the surround problems including exchanges, packing, and hauling.
Also, the weather is still not ideal and it has been rainy and mucky the two times I have tried having the family out while I work so I can spend more time with them. All of this has been adding up to a very frustrated and tired renegade.