Our New Wind Turbines

Words
59
Reading
1 min
9y
Listen to this post
~1 min

Four New Turbines. They should be comissioned at the end of the month.
P1010005 (2).JPG
P1010004 (2).JPG
P1010003 (2).JPGWith these four and the two that are already in operation at the desalenation plant, it will completely offset the energy needed to desalenate all of our fresh water.
As seen from the village of Mozaga. So majestic and I hope more to come.

Our New Wind Turbines | Ecency