bridges over drizzled waters: June 18 2024

it was drizzling when work ended but that wasn't enough to discourage me from doing my night walks. well, it did a bit but i went anyway. so now, i decided to go north. and here is the adventure (or misadventure) i had with the four bridges. allow me to share pictures i took along the way.

otake bridge

this was the first bridge i came across and this crossed the sumida river. you can still clearly see the wet pavement but the drizzling have subsided at this point. i took a zoomed shot of a lighted area in the horizon, the clouds above were so dark but there was a lighted gap just above the buildings. i guess that is how rain looks from afar. this bridge technically sits on the border of my home ward, arakawa, and the neighboring adachi. according to a quick wiki search, this steel highway bridge was initially constructed on 1934.

1000023940.jpg

1000023943.jpg

nishiarai bridge

i walked on further and reached this bridge which crosses an even wider river, the arakawa river. it is a bit funny that arakawa ward does not even touch this river at all despite the name resemblance. this river has a wider bank which had football fields. originally a wooden bridge on 1922, this concrete permanent bridge was completed in 1960. i wonder how deep this river was.

1000023947.jpg

1000023945.jpg

1000023950.jpg

arakawa river banks

i finally turned left and walked on the banks of the arakawa river. the area was beside the highway and was paved. this is great for walks and bicycle rides in daylight, there is sadly no lights at night. it was dark, i could not even see the faces of the passers by i walked past. but because it was dark, it was perfect to view the lighted buildings from across the waters.

ogi ohashi bridge

as i reached the end, i turned left and crossed the river again over this bridge beside a train line bridge. this steel structure was originally completed on 1974. the street lights were just beautiful at this point and the river was so calm. now i walked this bridge and it connected me directly to the next one.

1000023957.jpg

1000023960.jpg

1000023959.jpg

ogu bridge

the final bridge of the day which led me back to arakawa ward. we are now crossing the sumida river once again. now this steel one was completed on 1968 so i really don't know how it happened when i was fully connected to the previous bridge built on a later year.

1000023962.jpg

1000023964.jpg

1000023965.jpg

i ended my bridge journey going down this stairs at the side. now i am back at ground level.


1000023984.jpg

in total, i travelled 9.8 kilometers for 2 hours and 30 minutes. probably next time, i will need to go down and take pictures of these bridges from the sides just to see how good they are but that would be best done in daylight to see more details. that would not be a night walk then.

as always, take care and stay safe.
AMPING KANUNAY!


divider1.png

all content is by yours truly unless otherwise specified

all photos are taken with a galaxy s23 ultra

1000023986.jpg

This report was published via Actifit app (Android | iOS). Check out the original version here on actifit.io


18/06/2024
14769
Daily Activity, Gym, House Chores, Photowalking, Walking
Height
168.0 cm
Weight
71.9 kg
Body Fat
19.1 %
Waist
cm
Thighs
cm
Chest
cm


View this post on TravelFeed for the best experience.

H2
H3
H4
3 columns
2 columns
1 column
Join the conversation now
Logo
Center