20210904 Bungalow construction (slab rebar) - day 60

We are a couple of days from the main concrete pour of the project, the floor onto which both metal structures will stand.
IMG_8326.jpg
IMG_8317.jpg

Most rebars above the wooden formwork are now in place.
IMG_8318.jpg
IMG_8320.jpg
IMG_8324.jpg

Another set of "tofu" cement is being made. The small cubes will be used to keep the metal inside the beams when the concretes poured.
IMG_8303.jpg
IMG_8304.jpg

The "tofu" blocks are installed over the entire floor.
IMG_8321.jpg
IMG_8322.jpg

Electrical cables are ran inside the conduits.
IMG_8323.jpg

Material for the slab pour is delivered.
IMG_8325.jpg