Finishing the formwork and getting ready for the big day (tomorrow) during which we will pour the floor and the walls of the workshop in one go.
Connecting the rebars of the workshop "bowl" to the slab.
Andi making sure things are done right.
Adi in the middle of it all.
Two views of the outside corridor to access workshop.
Outside wall and slab columns. Water pipes and space for the second sceptic in front.
Outer side of the wall.
One of the angles of the pentagonal structure. 108 degrees.