Login
Discover
Waves
Communities
Login
Signup
Topics
#modelrailway
Global
Trending
Hot
New
Top
#modelrailway
New
Top communities
Create your community
latest #modelrailway created topics | Ecency
schmatz
Worldmappin
3y
The model of the Semmering railway in Reichenau castle (Lower Austria)
Reichenau Castle Last week we visited the Christmas market in the castle of Reichenau an der Rax. Reichenau is a market
$ 0.411
7
2
1
schmatz
DBuzz
3y
The model of the Semmering railway in Reichenau castle ...
#semmeringrailway #semmering #wieneralpen #reichenau #reichenauanderrax #modelrailway #modeltrain #austria #loweraustria #semmeringbahn #southernrailway via @joinTravelFeed
$ 0.192
3
schmatz
Worldmappin
3y
The Wachau as model railway layout
Last weekend we visited the IGM Wachau in Grunddorf (municipality of Grafenegg in Lower Austria). The IGM Wachau is an a
schmatz
Toys on Hive
5y
Our model train adventure - part 34: Tables, benches and barrels
We continued with some details next to our Wine Cellars so that they look like a Heuriger. I bought a set of Beer Tables and Benches from Faller (180444). In addition I bought some handmade wooden barrels
jompiy
Alien Art Hive
2d
Published via Ecency
Promoted
Small Drawings
I arrived late to Billy’s painting studio yesterday and he was leaving early for an appointment in town, so I only had a few hours to get some art done. No time to get my paints out and spend a good 25
schmatz
Toys on Hive
6y
Our model train adventure - part 33: The vineyard
Next to our wine cellar I built a terraced vineyard. For that I bought the set Grape Harvest by Busch (HO 1199). It was a lot of work and the parts were very small and detailled. All grapes had to be
schmatz
Toys on Hive
6y
Our model train adventure - part 32: The supermarket
Last year, we built a supermarket with matches.
schmatz
modeltrain
6y
Our model train adventure - part 31: The blossoming trees
As our model train layout should show all four seasons, I ordered some blossoming trees at AliExpress. They are of course not the quality of NOCH trees, but 10 trees only cost about EUR 1.20. I received
schmatz
Toys on Hive
6y
Our model train adventure - part 30: The mountain with the tunnel
Building the mountain with the tunnel was the most time-consuming part of our model train layout. I used tunnel portals that I already had when I was a child. I printed out a grey brick wall on a DIN A4
suzn.poudel
nepal
5d
Promoted
Support Nepal for disaster rescue, and relief.
Help Nepal in Crisis.
schmatz
Toys on Hive
6y
Our model train adventure - part 29: The winter village
Last November, we bought some Christmas houses and lamps at Action. All four houses had 3 LEDs inside that were powered via AA batteries. The houses are of course not in the same quality like the model
schmatz
Toys on Hive
6y
Our model train adventure - part 28: The wine press
For our model train layout I built a wine press with matches, a chopstick, two other sticks and filler.
schmatz
modeltrain
6y
Our model train adventure - part 27: The wine cellars
I created two wine cellars for our model train layout.
schmatz
modeltrain
6y
Our model train adventure - part 26: The USB vacuum cleaner
One of our latest investments was this mini vacuum cleaner. It is powered via a USB cable, but there is a battery version as well. It was originally intended for cleaning PC keyboards but it is perfect
borsengelaber
LeoFinance
1d
Published via Ecency
Promoted
Stocks, Gold & Bitcoin Rally on Waller’s Fed Signal
Bullish for Now, But the Fed Narrative Remains Unclear Markets are green today: Stocks, Gold, and Bitcoin are all gaining nicely. Why? Federal Reserve Governor Christopher Waller said today that he is
schmatz
modeltrain
6y
Our model train adventure - part 25: Interior lighting for the farm
As the weather was not that fine today, we also made the interior lighting for the farm (see here). For that we just bought a 3V LED chain with 10 LED for about 2 or 3 Euro. You can buy similar things
schmatz
modeltrain
6y
Our model train adventure - part 24: More street lights
Today I added more lights to our model train layout. First I had to do a lot of soldering and since this is not the healthiest activities for childrens' lungs I decided to do it at our balcony - at -1°
schmatz
modeltrain
6y
Our model train adventure - part 22: Creating a charging station for electric cars
As we had a petrol station we also wanted to have a charging station for electric cars on our model train layout. You can buy one by Faller (180280) but 16.50 EUR were too much for us so we decided to
schmatz
modeltrain
6y
Our model train adventure - part 21: Our PIKO Junior set
In February 2019, we visited an exhibition of the IGM Wien, a group of model train enthusiasts, in Korneuburg, Lower Austria. Both, my son and me, were taking photos. (By the way - you can see the photos
hive-125730
Mundo Autismo
14h
Published via Ecency
Promoted
Apoyando Contenido Musical en HIVE
Saludos. Mundo Autismo retoma la presentación del Reporte de Curación Musical, el cual estuvo inactivo desde el 2023. Deseamos recuperar esta acción desde donde le damos valor a la música, en cualquier
schmatz
modeltrain
6y
Our model train adventure - part 20: The railway crossing
After finishing our work last sunday (see part 19) we realized that we have forgotten to create ramps for the railway crossing. So I bought filler on Monday. On tuesday we created the ramps. As you can
schmatz
modelrailroad
6y
Our model train adventure - part 19: The petrol station and the farm
Last Sunday we also created the second quarter of our modeltrain. Well, it is not 100% finished yet. As we planned to have a lot of streets in this area, we painted everything with grey paint. As we knew
schmatz
modeltrain
6y
Our model train adventure - part 18: The campground
Last Saturday we created the landscape of the first quarter of the modeltrain - a campground with a lake. For the lake we used a special paper from Busch (7175 Feld, Acker, See), then we used grass glue
schmatz
modeltrain
6y
Our model train adventure - part 17: Moving the base plate to the final position
After mounting the self-made protective pads we were finally able to move the base plate to the final position in a corner of the room. Although I planned and calculated and re-planned everything for several
Older →