burden of households and industrial industries.
It is very necessary that a conductor or electric cable is in the process of distributing the pole, and also you need a pole to install and distribute the cable as a cable support so that it is free from any disturbances.
** Planning and Preparing the Establishment of a Concrete-type Electric Pole
** Requirements for erecting a concrete type electric pole
Included in one of the supporting components in the distribution network that are used for support devices and for holding cables or conduits is the definition of the electric pole. In the distribution network, the use of concrete type electric poles must be planted. Before you plant this type of concrete electric pole, you must be able to meet the following requirements:
You have to set a location point based on the plan drawing or Sketch you want.
To plant a pole at a predetermined tide point, you must first make a hole.
You must also plant the stake into the ground which is at least 1/6 X the length of the stake.
The tools that are used to erect or enforce a concrete type electric pole are a three-legged tackle complete with a chain pulley or something similar.
The erection of this concrete type electric pole will be perpendicular if you use a waterpass or plinth so that the one with the one that will be perpendicular.
If the soil structure you are working on is soft or soft, then you must strengthen the installation of the electric poles by meeting construction standards.
Preparation of Drawing Plans & Erecting Poles
The technical language in the form of symbols that is usually used to provide information about the size, shape, number and way of making something is the meaning of the desired sketch or plan drawing. You will need to take the following steps to create a plan drawing or sketch for erecting a concrete type power pole:
You must first trace the area or area that will be planted with electricity poles. It aims to determine the number and point of planting electric poles.
40 meters is the distance that you must determine to adjust the distance of one pole to another
You have to determine what type of pole is in accordance with the needs in use.
If you have done all of the above in full, you can enter it into the survey report format.
** How to install transformer **
located close to the consumer, the transformer is mounted on a power pole and attached to the power grid.
To secure the transformer and the system, the GTT is equipped with safety units that are placed on the Low Voltage Forwarding Device (PHB-TR), especially the system at the East Java PLN Distribution.
The step down power transformer functions to reduce from 20kV medium voltage to 380/200 V low voltage (transformer voltage reference 400/231 V).
For the location of the distribution substation, especially the type of transformer substation (GTT), which is directly adjacent to the customer service area, then GTT is distributed to consumers through the directions, and for each GTT unit, four directions are distributed.
Medium Voltage Network (JTM) or Medium Voltage Air Line (SUTM) 20kV.
Because the voltage is still high, it cannot be used to directly supply the load, except for specially designed loads.
The primary distribution is the channel that will supply the Transformer Pole Substation (GTT), equipment units that are included in the primary side, as follows:
Connection line (jamper) from SUTM to transformer unit (Primary Transformer)
Cut Out (CO)
Ligthning Arrester (LA)
Input channel
**