A hand poured beauty and a shop update…

Words
194
Reading
1 min
Listen
Play
2y

Afternoon everyone ….

It’s a muggy day here in the northeast with some big thunder and lightning storms rolling in this evening and tomorrow. It’s been in the high nineties for just about two weeks straight. We had a one day break after the last big storm that came through.

The electrician did the electrical rough out and connection to the existing house power in two days. I’d show you pictures, but there’s really not much to see on such big walls. There’s a hundred amp panel that was installed. But I’m going to need a whole bunch of electrical work done after the fact.

The electrician called for the inspection from the town. It will be on Tuesday, I don’t know the three hour window they are coming yet.

On a different note….

This is another piece of hand poured art from The Bear. It’s a vault style bar, and is the heaviest one that I own from him. This sucker is long and heavy, weighing in at 13.42 troy ounces. It’s got the same brushed finish as the others and it’s hog the original old school Bear stamp.

Here is the bar….

A hand poured beauty and a shop update… | Ecency