Pontefract Baghill, or Bag Hill is it was, is situated just to the South of the town centre almost at the foot of Bag Hill itself, which as we'll touch upon later, caused a number of construction challenges and extra expense, and opened for passenger traffic on the 1st of July 1879. The line had been opened for freight traffic a number of years earlier and was part of the Swinton and Knottingley Joint Railway which had been amalgamated into the North Eastern Railway as the railway companies rationalised themselves into bigger and bigger entities.
The line now created a complete link between the cities of Sheffield and York, and with the completion of the chord across the impressive viaduct to connect with the Leeds to Goole route at Monkhill Station, the potential for Baghill was huge with connections to all parts of the country.
The station originally had 5 platforms with the up and down lines and bay platforms at either end of the station connected to both up and down lines as well as a quite busy goods yard to the east.
The bay platforms were taken out of use and filled in back in the 1960s when the platform heights were increased to allow a straight step onto the more modern rolling stock and the lighting was converted from gas to electricity!
The station is now a little dilapidated and is a very humble and utilitarian building, but as we'll see, if you look hard enough, there is interest and history everywhere around us.
The North Eastern Railway was created in 1854 and was head-quartered in York, close to their stunning principal railways station and they were leading the way in railway architecture. They were the first railway company in the world to employ dedicated architects who were based in Darlington and Newcastle, to complement their engineering teams who worked on the railway's infrastructure.
George Townsend Andrews was the first noted architect to be associated with the railway company who as well as his impressive railways stations, designed the famous Assembly Rooms in York and his success led them to employ Thomas Prosser as their first official chief architect in 1854.
Under his guidance, this led them to develop a modular approach to design of the everyday buildings and infrastructure which would form the backbone of the network. Huge expensive grandiose stations in large cities were one thing, but efficient and economic building practises and usable structures on the rest of the network became the focus of his priorities.
A huge benefit of this approach introduced a method of modular design which allowed them to create a library of ready-made designs which could be modified easily to suit any requirement or location as the railways rapidly expanded throughout the late 19th century.
By the time Pontefract Baghill opened on that summer's day in 1879, they had the new techniques down to a fine art and as other railways companies scrambled to catch them up, the Great Northern Railways Company would become the biggest and most powerful regional operator in the country.
The next picture is Moorthorpe station which is on the same line and opened at the same time. As you can see, identical but a little shorter, a perfect illustration of what I mentioned earlier about developing modular building practises.
An open passageway led from the roadside to platform and is where the entrances to the offices were as long as the ticket office at which even i can remember queuing up for a ticket as a kid going trainspotting to York.
Pontefract Baghill also had a unique feature. To cross the tracks, it was standard practise to have a simple walkway across the tracks on the North Eastern network but at Baghill, they built a subway. It was always a bit scary, dripping with water and had the usual subway 'odours' as I remember as a kid.
I mentioned the difficulty building the station. This is due to Pontefract's topography as its built atop a series of hills so as well as the railway needing to be built on an embankment, so the station and approaches were as we can see in the next picture.
I find it interesting that everything was over engineered. The building is sat on a brick plinth that would mean extra width at the base that is in turn sat on the foundation. I've seen this often with buildings that were brick or wood on a stone plinth but must say, I've never noticed it with an all brick building before. The bricks themselves are simple, strong engineering bricks, again produced locally. The colour of them is typical of the local clays used to produce them.
According to the strategic Rail Authority, in 2002/3, only 36 tickets to and from the station were bought all year. I'm happy to say that this number is now much higher but with still only 10,900 passengers using the station in 2018/9, its future is hardly secure. It still has the dubious record of being the least used station in West Yorkshire. The service frequency is increasing though. There are now four trains a day in each direction between Sheffield and York.
The five-star hotel I mentioned at the beginning is
The North East Railway was growing rapidly towards the end of the nineteenth century and needed a prestigious, new headquarters. The chief architect at the time was William Bell, a man who had served with the railway as an apprentice under the guidance of Thomas Prosser, and from what I can gather, was part of the team that designed the Baghill 'style' of station and it was he, in conjunction with famous architect, Horace Field who designed the York Grand Hotel and Spa, which upon its opening was the headquarters of the Great Northern Railway.