Industrial Control Layout

Words
126
Reading
1 min
Listen
Play
9y

Hello all...

Just thought I’d share a few photos of the panel I’m building. This is what goes into an industrial control panel.

CCC0ED7E-0296-4C09-85DF-C8CB6E35C9D8.jpeg

This is the blank. I’ll lay everything on it and the mark it all out.

500DD3D4-1E7A-4A66-B1EB-3A25110B19D8.jpeg

Once I have all the surface mount components marked out I pull it all back off. Now I’ll drill and tap the holes and scuff up the back panel ground lug locations.

816775AC-E5EA-42F8-9303-051BAC5DACA6.jpeg

61636D87-09FD-41EB-986D-07352F3D11FD.jpeg

Now I’ll place all the components back onto the back panel and fasten them down.

32CD5689-8591-422F-BD08-15F8B4D5DDA9.jpeg

I build panels to a UL certification so all componentry has to be labeled.

88B2DF0D-E1A3-4549-AFBE-E3DD9E15B830.jpeg

CEC3DB67-A0CB-47C3-B63B-30756A21FCE6.jpeg

EDC60D49-2C16-4DBF-B049-3F0C4874705E.jpeg

C128F74E-589C-40D3-A95D-AC6FB15EC42E.jpeg

488315F6-0315-4C57-A82A-59ADEA90B8AD.jpeg

9400D447-FED3-4CF7-90DD-1BEC099C97B8.jpeg

02E8683D-B748-437D-BB85-3E1A595AF9C2.jpeg

59AE0F34-6CF5-4B75-BF3F-F00B721A46EA.jpeg

C215CB51-FACD-44BD-BD37-0B100CA64B1A.jpeg

Now that I have the panel all laid out and labeled, on to the wiring. We’ll save that for the next post! Until then Steem on!

Relay

Industrial Control Layout | Ecency