Hi there hope you are doing very well. This is a continuation from post yesterday on the Lake Margaret hydroelectric power system here https://partiko.app/@j85063/actifit-j85063-20190226t111831502z

Leaving the winch house and starting our walk along the 2.2klm long walking board that used to be the rail line as well.
You can see the old motorized trolley that used to run on the timber rails along the walking track. This replace the original steel rail line.

alt

I have a selection of photos here from our walk out to Lake Margaret. The walking track follows close to the pipeline though not always right beside it as you will see.

alt

alt

alt

A small work shed about a third of the way along.
alt

One of the few small water leaks in the pipeline.

alt

alt

Looking back.

alt

Here you can see some of the old pipe and structure.

alt

alt

Between a rock and a pipeline :)

alt

alt

Made it to the Lake Margaret dam.

alt

Thanks for following along and more to share of this trip tomorrow.