20211010 Bungalow construction (septic system) - day 96

Words
37
Reading
1 min
Listen
Play
5y

Concrete tops are poured to close the septic chambers that were installed two days ago

Main system
IMG_9003.jpg
IMG_9004.jpg
IMG_9006.jpg

Workshop system
IMG_9005.jpg
IMG_9001.jpg
IMG_9002.jpg

The cylinder is on top of the absorber tank which is the second chamber of the septic system.