20210917 Bungalow construction (swing walls) - day 73

Words
74
Reading
1 min
Listen
Play
5y

The second metal structure is erected.
IMG_8652.jpg
IMG_8666.jpg
IMG_8708.jpg

Swing walls are installed.
IMG_8721.jpg

Counter weights for the swing wall are made of concrete on site.
IMG_8667.jpg
IMG_8668.jpg
IMG_8669.jpg

Those counter weights are designed to fit exactly in a special space on the top part of the metal frame of the swing walls.
IMG_8712.jpg
IMG_8713.jpg
IMG_8714.jpg
IMG_8720.jpg

This will be the view when the wall is open.
IMG_8717.jpg

The second swing wall is in place, waiting for the counter weights to be installed
IMG_8718.jpg
IMG_8719.jpg

Another great day.
IMG_8726.jpg

20210917 Bungalow construction (swing walls) - day 73 | Ecency