20210725 Bungalow construction (bond beam) - day 19

Words
253
Reading
2 min
Listen
Play
5y

Foundation walls are done.
IMG_7520.jpg
IMG_7542.jpg
IMG_7541.jpg
IMG_7521x.jpg

The next step of the foundation process is to fill the space inside the walls with earth. It's almost done. Four trucks were necessary to get to this point. Earth on these photos is about 1 meter thick.
IMG_7529d.jpg
IMG_7531.jpg

The rest of the earth needed to complete this phase comes from the excavation to create the workspace under the main structure. It is moved with wheelbarrows.
IMG_7535.jpg

Adi presents the dimensions of the workspace to Arie, Andi and me. That pentagonal room under the main space is a recent addition. It made sense on many levels to use this volume. It requires a few adjustments but it looks like it's happening.
IMG_7519.jpg
IMG_7518.jpg

Metal reinforcement for bond beam. This uninterrupted ring of reinforced concrete sits on top of the entire foundation. The cement will be poured at the same time as the concrete slab for the entire floor.
IMG_7527.jpg
IMG_7528.jpg

Preparation of metal for bond beam. Rebars are bent following the wall's angles before being positioned in place.
IMG_7543.jpg

Preparing the column foundations to be connected to the bond beam.
IMG_7546.jpg

Trench on the edge of the property to redirect water from the neighboring rice fields following the subak, the Balinese cooperative social system that controls the water. https://whc.unesco.org/en/list/1194/
IMG_7537.jpg

We're feeling the Covid-generated oxygen squeeze. Arie needs oxygen to cut the metal beams of the structure with his torch but supplies are low because of the current Covid spike in Bali. His plasma cutter can only cut 90 degree angles and using the grinder is just not efficient.