Bathroom remodeling (before and after)

Words
114
Reading
1 min
Listen
Play
9y

Dreamsonics

So I remodel a lot of bathrooms and kitchens. Here is a nice bathroom I did a few years back.
Starting out, there was basic fixtures we had to remove and get ready for the renovation. I built in a 48x36" shower, installed a jacuzzi tub in the walk in closet, moved the toilet over 24", built in a closet, put in a double sink and cabinets with double lights, installed new hard wood french doors, and re-tiled the floor. This particular job took two months to complete. I think in this post I will put the pictures above one another to see the dramatic difference.

100_0690.jpg

100_0736.jpg

100_0689.jpg

100_0737.jpg100_0726.jpg

100_0693.jpg

100_0727.jpg

100_0698.jpg

100_0735.jpg
100_0731.jpg

100_0691.jpg

100_0729.jpg

I hope you enjoyed this transformation! :)

Bathroom remodeling (before and after) | Ecency