I've been working 8 days a week adding customers to my ISP, as our competition (Frontier) has really gone downhill this year while we just keep getting better.

So progress on the new site has slowed a bit! Even so, here's a review so far of how it's been going inside the equipment space.

We started out with a bare corner of an old aircraft hangar that was close to a fiber-optic line. I laid some gear out to see what we'd need as far as space goes.....
0 - Before we begin.jpg

Then we cleared the spot, put in a new exterior door and got started.
1 - Beginning.jpg

More framing work, and some of the plywood sheeting is up.
2 - Some Framing.jpg

And a shot from the inside, with a good view of the ceiling - gotta insulate to have a stable temperature! Temperature swings create humidity swings, which generate static electricity! Bad news for the gear...
3 - More Framing.jpg

All framed in! Got a hole cut up in the corner where the exhaust fan goes.
4 - Framed in!.jpg

Electric panel is installed, lights are up and the fiber-optic cable has been threaded through into the room from the rear of the building. That's it, hanging down from the upper left corner.
5 - Power & Fiber.jpg

And now it's time to paint! This is what I'm currently working on. Mmm, paint....good thing the ventilation fan is installed!6 - Painting.jpg

Next steps are to get the overhead cable trays and power conduit in, and the ducted AC unit set up. Then a billion other things before this is a fully functional Information-Technology space..

Thanks for following along, we'll keep you posted!