In this economic structure, the people of Indonesia
suffered the following losses.
When selling raw materials, Indonesian people are charged a price
low.
When buying finished goods that have been processed abroad,
Indonesian people are charged a very high price.
Indonesia's economic structure needs to be reformed. Indonesian nation
must be able to process raw materials into finished goods. This matter
means the transportation industry and activities to process materials
crude needs to be developed.
To overhaul this economic structure, it means the price mechanism
in the structure of the market economy should not be left free. Pattern
competition in Indonesia's economic structure, no
encourage structural overhaul. The price mechanism if left alone
free, does not encourage the process of changing producer relationships with
consumers are fundamentally and structurally.
The Indonesian government has the ability to see the process
changes that need to be developed from a macro vision point.
Government is in a position to see the picture of the situation
the Indonesian economy so as to know what aspects are necessary
driven and what aspects need to be allowed to grow on their own. Indonesia
need to work with a macro plan as a framework for reference
the effort of individual economic units in society.
In the macro scheme there are areas that need to be developed,
the growth rate of each sector, the source of funds, and the expenditure
is expected to be mobilized both from outside and within the country.
Once the macro plan is structured, economic activity is left to
individual economic units to work on macro plans
either directly or indirectly.
From these figures, the characteristics of the economic system are born
Pancasila. The economic system of Pancasila has a working market element
actively and the price mechanism used for the allocation of funding sources
and production factors. Planning elements work actively directing
economic development to the majors in accordance with the order of priority
planning. The pattern developed is a macro plan
focusing on strategic features, depicting estimates
sector development, and illustrates the limiting factor
affect the speed of development.
Planning elements work actively directing | Ecency