Finishing up my hand texture at The Redwater Kitchen

Words
83
Reading
1 min
9y
Listen to this post
~1 min

AAF2BBF9-F327-47A5-B945-4F01814EF874.jpeg
We are getting down to the end of yet another project.
My crew has done a fine job on the metal framing hanging and taping. I am pulling up the rear and giving it my own personal touch.
3C4B7B52-1A51-4E34-9F66-07363ECCDEA9.jpeg
Here is a close up of my texture
DAB24393-5244-41C8-B3CE-982EB0E2B082.jpeg
Here is a glance at the kitchen. The Chef is moving in and getting ready. We did the FRP panels, suspended ceilings and drywall.
3B55D853-E320-409A-AECE-8FB09AA44EB8.jpeg
Redwater Kitchen located downtown Spearfish will be opening around the 1st of April.

Finishing up my hand texture at The Redwater Kitchen | Ecency