Assalamualaikum everyone how are you all...????? I hope you are always in good health and eased in all your affairs... amen...

today I will share another story about the problem of rehabilitating the dream house that I am building now.

I have completed several stages, such as installing the bricks on the spearhead on the screen, the west side of the house is ready, the spearhead on the east side of the house is ready,

I installed two vents on the western side of the house, but on the eastern side of the house I only made ordinary vents out of

img20220409164430.jpg

img20220409164319.jpg

img20220409164308.jpg

the wood parts for now are all installed, in the last 7 days I worked. Finally finished the installation of the wood for the zinc retainer,

img20220409164253.jpg

img20220409163749.jpg

img20220409163708.jpg

the wood that I used for the roofing of the house, all 5 m long. while the wood that was attached to it was finished, 40 sticks of 2x4 centimeters of wood. 2x3 centimeters of 20 sticks, the most that was used up was 2x2 centimeters of wood.. It used up 120 sticks of wood.

total out of wood 180 rods but all of them are different sizes of wood, if the length of the wood is all 5 m.

img20220409163646.jpg

img20220409163622.jpg

img20220409163533.jpg

and this is the spearhead part of the west side of the house that I haven't plastered,

img20220409163529.jpg

img20220409163521.jpg

img20220409163438.jpg

img20220409163417.jpg

the installation of the lesplang boards has been installed, all the left side of the house has been installed, the right side of the house has also been installed, all the lesplang boards have been installed in the front and back.

a total of 12 lesplang boards were used up. and I have painted all the boards so they don't rot quickly,

img20220409163206.jpg

img20220409163122.jpg

img20220409163116.jpg

and this is the atmosphere of my friend who is resting, I took a picture, my friend is very skilled in the electric welding section, while I have expertise in the installation of plastering bricks and wood installation.

because we were tired and we chose to rest directly above the house and not go down,,

img20220409163054.jpg

img20220409163050.jpg

all the wood installation has been installed, so the next step is to install the zinc. The matter about the zinc I use or the color of the zinc I want to order is still a secret....

img20220409162956.jpg

img20220409163858.jpg

img20220409162829.jpg

in recent days the atmosphere is very hot, because I work in the holy month of Ramadan. so I have to maintain a balance so that, my body stays in shape when I work.

that's the atmosphere of my dream house that has been completed for this stage.

img20220409162743.jpg

For all of our friends, we really hope for prayers from all of you, so that we are always given health while we are working to make the dream house we have been dreaming of for a long time...

and for friends, may you all always be given health by the almighty god...

we on behalf of the big family alvonsohiver@alvonsohiver wish you a happy fasting for those who run it..... so much and thank you.....