Started with the design and fabrication of a gas cooker and burner from the past three days. We were able to finish with the whole stuff today. Truly it was stressful throughout the whole working days.

The fabrication and designing started by getting the useful materials from the source(market) such as ring, flag bar, 12mm rod, side plate, 2"pipe and the burner. Cutting them into their various sizes.

IMG_20181205_204241_481.JPG

And the welding started on a proper note. Thanks to God for the success