I took this video just after lunch today. As I was approaching the excavator, I captured a 360 degree video of our rock quarry.
First the new "jaw" (not operational yet),
The excavator I am sorting boulders with, and just to the right of the excavator, in the distance behind, is the blasters drill rig working on the bench I created previously.
In this still, only the blasters drill rig on the bench is shown.
The boulders too big for our current jaw.
The haul truck being loaded under a conveyor with one of the seventy three loads processed today. We processed approximately 2000 yards of product today. That's about 166 full size dump trucks.
And back to the new "jaw".
Leave a comment with any questions or interest in details and I will respond asap.
All images and video by @roundhere
▶️ DTube
▶️ IPFS!