Building crib/ Day 2 and 3

Hey, so me, @tsnaks, @sow and @yarikuzo decided to build ourselves a little hut/crib, where we can enjoy our summer.

In day 2, we made construction to the floor, where we can put floor tiles. Also we put wool to the walls.
Here´s the pictures of day 2.

66327076_458548114962876_1334525288956035072_n.jpg
*Photo taken by @sow

In day 3 we put the penoplast to the floor construction, and then installed floor tiles. That´s all. But it took very much time to saw all the tiles and penoplast to the right dimensions.


In this picture me and @yarikuzo marked up the right dimensions to the penoplast.


In this picture all( not really) the penoplast have installed.

In this picture 1/2 of the floor is installed with floor tiles.


In this picture all the floor is installed.

Basically that´s all, what we have achived with 3 days.

Thank you for reading this post!
Next posts of this crib are coming :)