Almost All Ceiling Joists Up - October 22, 2019 @goldenoakfarm

The view crop October 2019.jpg
The dining room view now….

Our signature oak tree has filled the addition with leaves. I debated going out and sweeping them up, and all the nails and trash. But I figured the 3PM wind would come up and it would not look like I’d done anything….

Construction - living room ceiling joists up1 crop October 2019.jpg
Living room looking southwest

But after laying down and resting for a while, I wandered out and started sweeping. Sure enough, the 3PM wind came up and the bedroom is full of leaves.

Construction - kitchen and dining room ceiling joists up1 crop October 2019.jpg
The kitchen and dining room ceiling joists are all up

He went out early on Tuesday morning and got the truckload of bagged dry leaves. Just as he arrived back at the farm, the truck with his lumber delivery was unloading. So he set about putting up the 55 boards he’d gotten for ceiling joists. He finished the kitchen and dining room first.

Construction - living room ceiling joists up2 crop October 2019.jpg
Living room joists all up

Then he finished off the living room, except where the masonry heater was going to go.

Construction - opening for masonry heater crop October 2019.jpg
Opening for the masonry heater

Construction - opening in floor for masonry heater crop October 2019.jpg
Floor opening for the masonry heater

The builder for the masonry heater came out mid afternoon to let my husband know exactly which ceiling joists he had to leave out. It looks like we won’t get the heater built until spring. We will have to figure out another way to heat the addition through the winter so we can work on it.

Construction - laundry, pantry bedroom ceiling joists up1 crop October 2019.jpg
Front – back: pantry, laundry, bedroom with leaves

He had gotten most of this section’s joists up by the time the builder showed up.

Construction - opening for stairways crop October 2019.jpg

He even remembered to leave the stairwell open this time.

Construction - laundry, pantry bedroom ceiling joists up2 crop October 2019.jpg
Front – back, from above: pantry, laundry, bedroom with opening for stairwell

Construction - kitchen and dining room ceiling joists up2 crop October 2019.jpg
Kitchen and dining room ceiling joists from above

He put up 51 of the 55 boards for joists today. He wanted to finish off the few that are left and start putting up rafters on Wednesday but it is supposed to rain all day.