where on the twenty-sixth day of the twenty-sixth month of the year two thousand and eighteen at my GI BIREUEN with the team have completed the installation work of Transformer Accessories where the TRF is in accordance with general arrangement (GA) and done the following work
Download shocklog
install transformer and oil purification
site test
with a voltage capacity of 150/20 KV getting good results on the site:
Transformer data
breakdown voltage of the insulating oil
water in sulating liquid test
insulation resistance test of cores, frames and grouding
insulation resistance and PI winding test
fans of current measurement motors
output from tranduce tap position measurement (4-20 mA)
check of phase displacement (vector group)
Calibration of temperature indicator
setting temperature
function test of control and accessories
visual check and completeness of transformer
oil leakage test
tan delta winding measurement
exciting current measurement
ration measurement
winding resistance measurement
SFRA test
this is the type of testing done on the job of the transformer