Like really it has been done since October and you are just now sending an inspector by. The city done inspected it and it passed their inspection when it was done. I also was here when the house was set. And watched all the steps they did to place my house. Including tying it down to the foundation. The so called "foundation inspector" is incompetent is trying to say my house isn't tied down at all and is just sitting on the foundation.
The house lines up with it, then it is screwed down in place. But no according to this incompetent inspector he is saying we don't have them. But I have photographic proof we do. He also tried saying we don't have any concrete footers under the support beams. Once again dude you have no clue what in the hell you are talking about because I have photographic proof that we do in fact have the footers poured before the block was set.
I called them up and told them about how the guy they sent out one, called me on a holiday wanting to come out yesterday on the holiday and I told him no, it was a holiday he could come today. We set the time for 4 pm but he didn't arrive till 5:30 then he tells me this information that I know is 100% totally wrong and I know it for a fact. I told them what was going on, how it was unprofessional and that the guy was also talking about our sump pump, he was saying he didn't see one, because our septic guy didn't run the wires in the hole he ran it beside it to keep the electrical lines out of water. But that isn't even his job to be checking out the sump pump.
I told him they better get someone out here to fix all the issues or I am going to my attorney. I am so over all the headaches and incompetency that we have been dealing with. Seriously it doesn't take rocket science to build a house, and I swear the people we have been dealing with think it does. They seems to be taking me seriously now though, so hopefully the issues that we are actually having like the siding will be fixed soon, so we can get out of our construction loan and get into our mortgage so I can start paying off the principal. Interest only during construction sounds nice but it really isn't.
What gives there? If anyone has any idea why this is please let me know in the comments below.