Words
34
Reading
1 min
3y
No, it’s in a schedule 40 PVC buried over 48 inches deep. Just 20 or so years ago the cable was thrown in the ditch with no conduit - Direct buried
No, it’s in a schedule 40 PVC buried over 48 inches deep. Just 20 or so years ago the cable was thrown in the ditch with no conduit - Direct buried
RE: Someone found some buried high voltage cable. He got lucky he didn’t damage the ...