Quality project of President Duterte.

Words
58
Reading
1 min
Listen
Play
9y

Just opened the Cagayan de Oro Coastal Road, a 12.77 km project which started in 1997. It will serve as a bypass road starting from Brgy. Gusa in the eastern side all the way to the western side in Brgy. Igpit, Opol in Misamis Oriental, thus connecting six (6) barangays in the city and two (2) barangays in Opol.

Quality project of President Duterte. | Ecency