Construction site - My Actifit Report Card: September 2 2025

Words
118
Reading
1 min
Listen
Play
1y

The majority of today's actifit@actifit steps were accumulated walking out of town on my usual route.

The construction is slow at the site of a future place of worship. I have done push-ups on the foundation a few times. One day down the road, the building will have walls and locked doors.

alt

I did a lot of building in the back yard this morning and afternoon, and I moved a few hundred pounds of cast iron weight and a large mound of river walk.

alt

alt

Thank you from runridefly@runridefly


This report was published via Actifit app (Android | iOS). Check out the original version here on actifit.io


02/09/2025
26041
Daily Activity, Calisthenics, Gardening, House Chores, Walking, Weight Lifting, Shoveling