Marine Quarter Building

Words
78
Reading
1 min
Listen
Play
5y

22/02/22.

Basement structure was finalized, with concrete, and some pipes running.

The photos shows one level above.

So I'll count as second floor.

Please I would love to hear comments and feedback from professionals from different parts of our globe.

There is no update from 23/02/22 as the rain was pretty intense, something like 300mm of rain in the morning plus 500mm in the afternoon up to 700mmm in some areas of the Gold Coast.
It was huge.

img_0.847652529156428.jpg

img_0.9554847361271389.jpg

img_0.8281040353979393.jpg

Marine Quarter Building | Ecency