PASO SAN BOLDO - ITALY
The 5 tunnels that perforate the mountain have a maximum width of 5.50 meters, and a height of about 3.20 meters, so trucks and buses are prohibited from entering: they would not enter when taking the curve or they would not enter by height.
The current road replaced a steep path that was formerly and that reached the summit. Although the idea of paving and tunneling the area to adapt the passage to motorized vehicles had been on the table since the late nineteenth century, the project was not carried out until the First World War. It was the Austro-Hungarian Empire that carried out the construction so that the logistics of armament was more accessible in the area.
Thus, the works of the current San Boldo Pass began in February 1914 under the direction of the engineer Giuseppe Carpenè. Prisoners of war, elders, children and local women were forced to participate in it. It is said that up to 1,400 people took part in the construction, which was completed in a record time of 100 days, hence its nickname of "The 100 day highway". Despite the extreme topography of the place, one of the requirements was that the maximum slope did not exceed at any time the 12th, so that the passage could be traveled by heavy artillery since it was a strategic route for the supply of fuel during the Second World War.
Note: @sirknight started a contest and its daily topics are:
Sunday-light
Monday - Darkness
Tuesday-AnimalDeer
Wednesday-Structures
Thursday-ForcesNature
Friday-AmorBellezaFreedom
Saturday-Agriculture