I spent a fair of my time this summer buildin a patio in the back yard. The better half would like to have people over and with physical distancing, get togethers on the patio would be allowed. Most days I would work 1 1/2 to 2 1/2 hours as the temperature would start at ~25C and 70% humidity and end at +30C and ~20% humidity. So here are some pictures of the process:
1st day
About a week later, relaxing with the b-dog
taking a break with the b-dog (inspector 馃槈)
Lot's of work, had to cut down grass to level ground before laying blocks
Almost finished and there is the inspector again, laying on my leveled sand....
Different angle of finished patio, just need to spread sand into cracks between blocks.