Login
Discover
Waves
Communities
Login
Signup
loop-manager
@loop-manager
43
Followers
15
Following
8
Follow
Email digest
Resource Credits
Available
Used
Created
2019-09-14 13:42
RSS Feed
Subscribe
Posts
Blog
Posts
Comments
Communities
Wallet
loop-manager
SCT.μνΈνν.Crypto
6y
Night View from the Sea
So beautiful and something different from daily view. NG will run through before summer.
$ 0.022
5
1
loop-manager
sct
7y
Pig arrived.
Pig arrived.
$ 0.063
15
loop-manager
sct
7y
Power on
Finally, we got the power for jetty system. System will be ready and we'll reach the goal.
loop-manager
sct
7y
Road no. 30
We are running on road no. 30 through the dark every in the morning. I hope all the work in safety and coming back to sweet home.
loop-manager
sct
7y
Parm Tree over the painting.
I found beautiful painting art in the immigration office. Live parm tree really matching with Kuwait tower and fishing boat in the painting also.
loop-manager
sct
7y
Folder preparation
The preparation of folder is the first step for loop test activity and it is very essential. Required drawing/documents are depend on contractual agreement. However, in general, below listed are the most
loop-manager
sct
7y
Loop Test
Loop test is a pre-commissioning activity and last step before commencing the commissioning of system or plant. It can be performed after construction completion. During the testing, we can verify the
loop-manager
sct
7y
Housekeeping [Photo]
We are doing daily housekeeping to maintain our working area clean and safe.
loop-manager
sct
7y
Dates
Under the piercing sunshine and the steaming hot wind, the dates are ripening. Photo from Korean guest house in Khiran, Kuwait.
loop-manager
sct-en
7y
Team building - We are the best.
We are here to complete the best project in Kuwait. I think it's the best team i've ever worked on. Thanks to everyone on the team.
loop-manager
sct
7y
Don't forget
We need to use proper tools for all activities. Improper tool using will result in cost and schedule impact. Above photo shows somebody used screw drivers instead of key for opening the door. After loop
loop-manager
sct
7y
TK3
Loop tests are on-going and we are using TK3 micrometer for axial vibration simulation.
loop-manager
sct
7y
Protection is required.
Network cable laid without protection. It could be damaged easily even indoor. Need to be rectified.
loop-manager
sct
7y
Test
System will be ready in some days.