Sondering test (CPT) and Hand Bor test

Words
64
Reading
1 min
9y
Listen to this post
~1 min

The construction project of ADM Lampulo Building, Banda Aceh.

Sondering test first point (SO-01)image

Sondering test the second point (SO-02) imageThe long distance of first and second point is about 100m

While the hand drill is done when the sondering test is done, just do the hand drill job, because the hand drill is aimed to take soil samples to do the laboratory check. image

Sondering test (CPT) and Hand Bor test | Ecency