It is an early morning here at Humble Valley, and we are continuing with the bathroom remodel. Yesterday was a real big day. We removed the closet from the upstairs bedroom which gives more space to the upstairs bathroom.

We had to remove all the existing drywall, cut out the framing, reframe the bedroom wall, rerun the electrical on that wall, and put the insulation back in. We got a surprise though....the water heater exhaust pipe runs up through the bathroom and needs to be moved to allow room for a full sized bath tub. Everyday is an adventure!

Thanks for joining us!