From: Zorro Ranch [email protected]
To: HBRK Rich Kahn [email protected]
Date: Jul 21, 2015 7:01 AM
FYI
As of Friday last week we lost all century link lines Alarm, lodge, log cabin gates office LV Believe water has penetrated an old splice I have managed to contact a retired century techs and they are working on r=pairs This will be a cash deal
Sent from my iPhone
From: Zorro Ranch [email protected]
To: HBR
Date: Jul 21, 2015 1:01 PM
(no body)
From: Brice Gordon [email protected]
To: HBRK Rich Kahn [email protected]
Date: Jul 30, 2015 9:19 AM
Attached photos for your reference
Basic Armageddon happen on the phone system Lightening strike RC Water in Two splices One seriously pissed off rodent chew 25 pair at lodge
Status
The repair to the copper centurylink lines completed All lines at RC and LV house are fixed Fire alarm line main house, fixed Lodge and log cabin fixed
One 10 ft 50 pair splice Can we proceed with paying in cash,
From: Zorro Ranch [email protected]
To: HBRK Rich Kahn [email protected]
Date: Jul 30, 2015 1:57 PM
I would like to pay these guys as they really stepped up to plate on this one
Rich
Attached photos for your reference
Basic Armageddon happen on the phone system Lightening strike RC Water in Two splices One seriously pissed off rodent chew 25 pair at lodge
Status
The repair to the copper centurylink lines completed All lines at RC and LV house are fixed Fire alarm line main house, fixed Lodge and log cabin fixed
One 10 ft 50 pair splice One 10 ft 25 pair splice 250 ft of new cable for lodge and lodge cabin plus other misc material were used cost $560 2 guys for 5 days, 8 plus hours per day Total cost for material and labor $4160.00 Please note the following, we have completely separated the main house phone system from lodge and log cabin Due to time restraints I elected to use the century link JEE emergency line and the secondary fire alarm line to get though the visit We will need to sort this out later, after the visit
As explained this was a cash deal
From: Zorro Ranch
To: Richard Kahn
Date: Jul 30, 2015 9:36 PM
Sorry this started with the wrong e mail
My mistake
Sent from my iPhone
From: Richard Kahn
To: Zorro Ranch
Date: Jul 31, 2015 2:43 PM
No would like to review with you in detail as I was unaware of entire situation which happened over 10 days ago. Paying 4000 cash to vendors is not acceptable and should be discussed over the phone not sent over email.
Sent from my iPhone
From: Zorro Ranch
To: Richard Kahn
Date: Jul 31, 2015 2:52 PM
So you would prefer to pay Amtel rates to do this work I had no choice I will speak with Jeffrey directly about this Thx for your support And who the ccd person this
Sent from my iPhone
From: Brice Gordon <brice.gordon@...>
To: Jeffrey
Date: Aug 2, 2015 10:37 AM
Jeffrey
can we discuss please before you leave today Rich has issue with paying these g=ys who really stepped up to plate and got the phone systems sorted out.
They are not vend=rs, they are retired Century Link pers, total cost for $4160.00 Cash, for =wo peers, this includes labor and material thank you Brice
From: jeffrey E. [email protected]
To: Brice Gordon, Richard Kahn
Date: Aug 2, 2015 2:39 PM
pay it, and then we will talk during the week
SHA-256: 905fccd9415caef78fa0a6304f014bfa831e8aa15a9043658df8d0b221958379
Source: https://www.jmail.world/thread/EFTA02718430?view=inbox
Doc ID: EFTA02718430
RE: Rich Kahn - Email Archive