Back again with me @darkasyi794.
Construction of an aspect that is most important for society in general. One of the constructions that the community really needs is roads, with roads people can easily visit from one place to another. On this occasion I would like to explain the procedures and what is needed to work on road pavement.
There are several stages to work on this project, namely:
Moto:
MOBILISASI
Mobilization is bringing in the equipment needed in the execution of work, for example, tandem rollers, motor graders, excavators, tire rollers, vibratory rollers, asphalt mixing plants.
This is in the photo above an example of transporting base B material using a dump truck to the job site after leveling it using a motor grader.
This is in the photo above an example of compacting material using a motor grader so that the base B material can be evenly distributed in all areas and after this it is compacted using a vibratory roller.
This is in the photo above an example of compaction using a vibratory roller so that the solid base B material has no gaps for water to settle so that the road can last as long as you want.
WAY AGENCY PREPARATION
This is in the photo above an example of transporting base A material using a dump truck to the job site after leveling it using a motor grader.
This is in the photo above an example of compacting material using a motor grader so that the base A material can be evenly distributed in all areas and after this it is compacted using a vibratory roller.
This is in the photo above an example of compaction using a vibratory roller so that the solid base A material has no gaps for water to settle so that the road can last as long as you want.
Class A Aggregate Underlay
Class A foundation layer is the foundation layer on the part of the pavement which is located between the subbase layer and the surface layer.
The function of this top foundation layer is:
This is in the photo above an example of transporting asphalt using a dump truck to a location and leveling it using asphalt mixing plants so that it is evenly distributed and can set how thick the asphalt is needed and after this it is compacted using a tandem roller.
Look at the photo above of an example of leveling asphalt using asphalt mixing plants.
This is the photo above of an example of compaction using a tandem roller how it works using vibration.
Asphalt Pavement Work
Prime Coating is the work of sprinkling a mixture of bulk asphalt that has been mixed at high temperatures in a heating tank at the AMP.
Laston work (AC-BC) is the first structural asphalt pavement on the surface of the road body, this work can be carried out on the surface by sprinkling with a layer of absorbent binder or on a layer of pavement.