It wasn't until November of that year when I formed up and poured the curb wall that the structure would rest on. Then in May of 2017 I hired a contractor to install floor drains and pour the concrete floor.
I began framing the walls each evening after work in September 2017. My goal was to have the structure enclosed before winter. I ordered manufactured roof trusses from a company here in town, which my friends and I lifted into place one scorching hot September afternoon.
Next, I sheathed the roof and walls with OSB. I stapled synthetic felt paper on the roof, and Tyvek housewrap on the walls.
I installed the windows, walk-through door, then the two 8' x 10' insulated overhead doors. I put steel shingles on the roof to match the house. I installed vinyl siding on three sides of the garage, and put stone veneer on the front.