After coating, post handling procedures for any problems. In other words, when non-configuration occurs, a defect tag is attached, isolated in the defect storage box, and a record is left, which is the inspection check sheet.
After coating, post handling procedures for any problems. In other words, when non-configuration occurs, a defect tag is attached, isolated in the defect storage box, and a record is left, which is the inspection check sheet.