Today was freezing cold but the show must go on. Dirt being excavated for the auxiliary building foundation,and topsoil being stripped off near the back corner for the fabrication yard to be setup.

9E4A9367-D9A6-4906-800D-75F36E214137.jpeg

7BFC6331-60C2-433C-9F03-4F64016BE825.jpeg

F62660A7-49B1-4C23-99EF-8CEF53400D8F.jpeg

As well as the concrete pump truck getting setup and ready for concrete trucks to arrive. They will be pouring some of The piers for the warehouse building.

D8806511-3065-4B75-AB0A-94BF9CE182C3.jpeg

I will also be building a raised bed garden area at my camper, where this beautiful topsoil will be placed for some delicious vegetables to be grown in. I love me some fresh veggies.

BCD0BA36-EE59-4EB3-A564-C30B4CE6E5C6.jpeg

So until next time take care and see y’all tomorrow.