Well hurry up everybody concrete is on the way. 200 yards for the first pour of the turbine foundation.

9DB3CC24-14ED-49E4-82C7-38C60D9E987E.jpeg

We setup the pump truck and began prepping for the trucks. Controlled chaos.

26F4479F-7F1D-40C9-857A-A03A3F5343AC.jpeg

4AE73644-0619-4C0B-8613-FED84FEC6260.jpeg

EDED8E8E-B705-40EE-81F7-A7CE17A00906.jpeg

Worked straight through lunch. But they enjoyed the 30 pizzas brought to them. Funny thing though they said next time put jalape帽os on it lol. Go figure 馃槀馃槀

109AB75B-0E0D-417F-8354-CF28E636F0EF.jpeg

C15DAA48-7160-4075-86D8-805ADC4C94C1.jpeg

I must say there concrete work is better than there dirt work. The first part of the pour is finished and Friday the second pour will begin.

7FEFAA34-6BEB-4381-9EC6-3053D7CC20C8.jpeg

97942F81-2B1F-40D0-9CE8-3DBC8F12DC56.jpeg

2A55D786-5DAF-4C0F-98E2-9AAA80B8501C.jpeg

554A29C6-E67C-4CA8-AB86-90FAE24775F8.jpeg

65232A8E-1678-4F40-B445-35702F9C9D33.jpeg

2BC0573A-4137-42AF-9F4B-EB972F690B02.jpeg

I knew these skies were a good omen, keep these beautiful days coming and the schedule will be easy to keep up with.

7D5C46BE-CF24-4D3A-9D6B-091341E53A5D.jpeg

So until next time take care and see y鈥檃ll tomorrow.