Sunday night. Tomorrow starts the new week, and I have three days to put together the upgraded cooling system. Fortunately, I have a list of materials shipping second-day air. Unfortunately, the exhaust adapters I purchased on the 25th of January have still not been shipped from Florida... So, onto the stats...
After the overheating debacle, I have been running the miners at 450 MHz (except number five, which runs at 400 MHz because it's the troublemaker of the lot). Still seeing a 3,360 MH/s average hash rate; however, the rig is now down to 0.37 LTC/day. This is critically low, so getting the cooling set up is a must.
You might notice that there was a sudden, system-wide overheat late this morning; That was due to my simply going into the room to inspect the intake ducting. Just offsetting the potentially cooler air with my own mass and heat cause the temps to momentarily jump up. I really don't like this.
Hopefully, tomorrow will bring better news about the items in transit and I can make it to the hardware store to get some materials and be building by Tuesday evening. I'll post pictures as I progress.