Steps for Planning Fence Building Construction - Civil Engineering

Words
632
Reading
3 min
Listen
Play
7y

Every time we plan a construction, be it a building, an irrigation building, a road building, a bridge building or a fence building, it certainly has steps that we must go through one by one. These steps are our way to complete a task that must be completed in a short time.

Here I want to explain about how to complete a planning product for fence construction, and still hold on to the basic theory set by the government or a country. If in my area (Aceh) such work is generally not much money spent by the state, only to meet the construction work.

Unlike the case with jobs such as construction of large buildings, the funds spent by the state are sufficient for all needs.

PicsArt_03-05-12.23.54-01-01.jpeg

The first step must be done by the planning team

  • Survey

Reviewing the field or work location that will be built later. For this or what we usually call is Survey, we must first meet the owner of the job site and ask what they want for the work or funds issued by this government.

After asking and getting answers from the site owner, that's when it is our duty to measure the location for future development. One more step that must be completed here is to get agreement from the location owner that what we plan according to what they want.

Measurement results at job sites

IMG_20200305_125450-01.jpeg

  • Documentation photo

In this section is a part that can not be abandoned, why? Because this photo documentation is part of the product planning that will be checked by a team of experts when the products we make are approved by a team of experts. This means that the one responsible is not only the planning team, but also the team of experts who approve or authorize it to be done as the results of calculations or drawings of the plan.

1. Field photos or surveys

IMG_20200225_122601-01.jpeg

2. Field photos or surveys

IMG_20200225_122529-01.jpeg

  • Planned Image

After all the steps above have been completed, now I have to make a plan and volume calculation in accordance with the measurement data that we got. Here I make 2D drawings, and the application that I use is Auto-Cad, which certainly uses a laptop, because this can't be done via cellphone.

  • Volume and Cost Calculations

After the drawing plan is complete, the next step is to calculate the volume and overall costs, here we can adjust it to the funds that have been set.

Drawing Plan 1

Post1.png

Drawing Plan 2

post2.png

Drawing Plan 3

post3.png

Drawing Plan 4

post4.png

Drawing Plan 5

post5.png

Drawing Plan 6

post6.png

The plan picture above is a part of the complete plan picture.

The Importance of Drawing a Plan?

The plan drawing is a guideline for people when the work takes place, if the drawing plan is not clear, it will affect later on and will be a big problem. Detailed drawings must also be complete so that people can more easily make the fence construction, and there is no difference between the calculation of the volume and drawing plan.

My tips are to work according to the rules that have been set and must be guided by basic theory. Unlike the case if the results in the field are not the same as theory, then consulting with a team of experts is the only way.

The steps above are based on the rules and theories (specifically my area). Every country has different methods of operation, but the benefits are the same.


Posts about Civil Engineering


Thank you for all

By


® B A R V O N

images (8)-01.jpeg

Steps for Planning Fence Building Construction - Civil Engineering | Ecency