Words
63
Reading
1 min
Listen
Play
3y
The concrete had came lose but I think it's the together vibrations from renovation and block repairs hacking and drilling that had made it broke off. There isn't any renovation upstairs but there are two on the same floors and one two floors above but there are lots of a hacking and tiles changing work at all 40 floors of the elevator lobby.
RE: 📷2nd COVID-19 Day 4 - The ceiling fell | 第二次患冠病 第 4 天 - 天花板塌下😎(by @ace108)