The construction project of ADM Lampulo Building, Banda Aceh.
Sondering test first point (SO-01)
Sondering test the second point (SO-02) The long distance of first and second point is about 100m
While the hand drill is done when the sondering test is done, just do the hand drill job, because the hand drill is aimed to take soil samples to do the laboratory check.