Sondering test (CPT) and Hand Bor test

The construction project of ADM Lampulo Building, Banda Aceh.

Sondering test first point (SO-01)image

Sondering test the second point (SO-02) imageThe long distance of first and second point is about 100m

While the hand drill is done when the sondering test is done, just do the hand drill job, because the hand drill is aimed to take soil samples to do the laboratory check. image

H2
H3
H4
3 columns
2 columns
1 column
Join the conversation now